When the job outgrows diesel — the secondary market for gas turbines, and how it trades.

Sell Power Equipment

TURBINE — MW SCALE HOURS + CYCLES ABOVE ~2 MW — THE TURBINE MARKET
TURBINE MARKET MAPGEN HUB PLATE 10 OF 10
BEYOND DIESEL

When the job outgrows the genset.

Above ~2 MW, the economics shift from diesel reciprocating engines to gas turbines: more power per pound, fewer moving parts, and the ability to burn natural gas cleanly at scale. Used turbines trade in a specialized secondary market — decommissioned peaker plants, industrial cogen, oil & gas. This guide maps it.

Decommissioning power equipment?

We buy at facility scale — gensets to turbines. Talk to us →

THE MACHINES

Turbines on the secondary market

Aeroderivative

Jet engines adapted for power (GE LM series, Siemens/Rolls-Royce Trent-derived): 20–100+ MW, fast start (minutes), high efficiency. The premium tier — peaker plants and offshore platforms. Used aeroderivatives trade on hours, cycles, and hot-section condition.

Heavy-frame industrial

Purpose-built ground turbines (GE Frame series, Siemens): 50–500 MW, slower start, built for decades of baseload. Decommissioned units from plant closures — the buyer needs a crane, a plan, and a grid connection.

Microturbines

Sub-megawatt (30 kW–1 MW, Capstone the known name): cogen, commercial backup, oil & gas. The accessible end of turbines — closer to the genset market in how they trade.

THE MARKET

How used turbines trade

Turbines do not trade like gensets — there is no “trailer it home” tier. The market runs on hours and cycles (turbine life is counted in starts as well as hours — peaker duty is cycle-heavy), hot-section condition (the combustor and turbine blades are the wear items; borescope reports are the inspection), and maintenance agreements (OEM service history from GE/Siemens is the provenance). Decommissioning sources: peaker plants retired by grid changes, industrial cogen replaced by utility power, oil & gas facilities. The buyer pool is utilities, IPPs, and large industrials — a small, serious market where one informed buyer beats ten tire-kickers. Values are entirely case-by-case: model, hours, cycles, hot-section life remaining, and whether the controls and auxiliaries convey with the unit.

DECOMMISSIONING

Where used turbines come from

The supply side: peaker plants retired as grid batteries and renewables change dispatch economics; industrial cogen shut down when the host facility closes or switches to utility power; oil & gas facilities consolidating or electrifying; export markets absorbing units the domestic grid no longer wants. Decommissioning a turbine is a project — inerting fuel systems, crane picks measured in hundreds of tons, and preservation (fogging, desiccant, nitrogen blankets) if it will sit before resale. A properly preserved turbine with records is a marketable asset; one left open to weather is a parts donor. The preservation photos matter as much as the hour count.

DUE DILIGENCE

Turbine due diligence: the checklist

Before money moves on a used turbine: borescope report (hot-section condition — blades, combustor, nozzles; the single most important document), hours and starts (both — peaker duty is cycle-heavy and cycles drive maintenance intervals), OEM service history (GE, Siemens, or qualified independent — what was done, when, by whom), remaining life assessment (hot-section life remaining in hours/starts before the next major), controls version (obsolete control systems can cost more to upgrade than the turbine), and what conveys (auxiliaries, inlet/exhaust, generator, switchgear — the turbine without its package is a project). Turbine deals die on missing paperwork, not on price — the informed buyer’s first request is always the records.

QUESTIONS

Turbine questions, answered.

When does a turbine beat a diesel generator?

Above ~2 MW, or where fast start, power density, or clean gas-burning at scale matters. Below that, reciprocating gensets win on cost and simplicity.

What matters most in a used turbine?

Hours AND cycles (starts wear turbines), hot-section condition (borescope report), and OEM maintenance history. Same diligence as a genset, higher stakes.

What is the difference between aeroderivative and heavy-frame?

Aeroderivative: jet-engine derived, fast start, 20–100+ MW, peaker duty. Heavy-frame: purpose-built, slower start, 50–500 MW, baseload decades.

Are microturbines a real market?

Yes — 30 kW to 1 MW for cogen and commercial/industrial use. They trade more like large gensets than like frame turbines.

Can Ironcrest handle turbine-scale deals?

Large turbine deals are outside what we typically buy, but we review facility-scale power equipment inquiries individually — send the model, hours, cycles, and hot-section status and we will give you a straight answer.

HOW IT WORKS

Sell your generator in three steps

1. Photograph it

Nameplate (make, model, kW, serial), hour meter, and overall condition. The nameplate is the entire specification.

3. Get today’s price

A real offer based on your photos and today’s market — not a calculator, not a guess.