01Pull the permit and schedule the utility
File the electrical permit and schedule the power cut with the utility — meter pull, service-drop disconnect, or both, depending on the setup. Utilities work on their own schedule, so this appointment often sets the job date. Confirm with the homeowner that everything needing power (sump pumps, medical equipment, refrigerators) has a plan for the outage window.
02Verify dead — everywhere
After the utility disconnects, verify absence of voltage at the panel with both a non-contact tester and a meter: line side, load side, every bus. Test the meter on a known live source first so you know it works. The service conductors ahead of the main are the lethal part of this job; treat every conductor as live until proven otherwise, and re-verify after any break in the work.
03Document the existing panel completely
Photograph the old panel from multiple angles, note every circuit, breaker size, and wire gauge, and label each cable as it comes out. This documentation is your reassembly map. Note the grounding electrode conductor routing, the neutral-ground bond, and any double-tapped breakers or other existing violations you are about to fix — the new panel must be fully code-compliant, not a copy of the old sins.
04Remove the old panel and prep the location
Disconnect branch circuits one at a time, labeling each cable, then remove the old enclosure. Here is the pro technique from the trade: when the new panel cannot land in the exact same spot, the old panel enclosure can be reused as a junction box — gutted, fitted with a blank cover, with splices made inside per NEC 312.8. This saves extending every home run and inspectors accept it when done cleanly.
05Mount the new panel and establish grounding
Mount the new enclosure plumb and secure, then build the grounding electrode system: grounding electrode conductor to rods, water pipe, or building steel per NEC 250.66 sizing, with the neutral-ground bond made in the service panel (NEC 250.24). Verify grounding electrode continuity before landing a single branch circuit — grounding is the safety backbone of the whole installation.
06Land circuits neatly and torque everything
Route each labeled home run into the new panel through proper connectors, leaving neat service loops — the panel should look organized, because inspectors read neatness as competence. Land neutrals on the neutral bar and grounds on the ground bar, then torque every termination to the manufacturer's specification with a calibrated tool (NEC 110.14(D)). A loose lug overheats silently for years before it fails.
07Label every circuit per NEC 408.4
Fill out the panel directory completely and legibly: every breaker identified by room and load, no blanks, no mysteries. NEC 408.4 requires it, inspectors check it, and the homeowner needs it the first time a breaker trips at midnight. While you are at it, label the main disconnect clearly and confirm the panel's short-circuit rating suits the available fault current.
08Restore power and test systematically
With the utility's power restored, energize the panel and test methodically: voltage at the main, then each branch circuit under load. Trip-test GFCIs and AFCIs, verify every receptacle and switch in the house, and check for abnormal heating at the panel after 30 minutes under load. Walk the final inspection with your permit card, torque documentation, and the load calculation ready.