We are decommissioning a data center. Will you buy everything?
We buy the entire power side in one lot: UPS systems, battery cabinets, generators, switchgear, PDUs, busway, transformers, and all copper cable. For servers, storage, and drives, use a certified ITAD firm — we coordinate timing with them.
What does the copper cable plant include?
Feeder cable from switchgear to UPS and PDUs, PDU whip assemblies, branch circuit wiring, busway (heavy copper bars in aluminum housing), and the grounding grid. In a large facility this runs to tons of copper.
How do we handle data security?
All data-bearing media goes through your ITAD provider under NIST 800-88 sanitization with serialized chain of custody and certificates of destruction. Our purchase covers power equipment only — no data-bearing assets.
When should we contact you in the process?
As early as possible — during planning, before disconnection. Nameplates are easiest to read and equipment easiest to value while still installed. Early contact also lets us sequence the power sale around your ITAD schedule.
Do you handle the electrical disconnection and rigging?
Electrical disconnection must be performed by licensed electricians, and heavy equipment needs professional rigging. We discuss logistics — including who handles what — as part of the offer conversation.
Do you buy single units or only full teardowns?
Both. A single retired UPS or generator gets the same serious review as a full facility lot.